Purpose:  This procedure demonstrates how to modify a competition panel in the G5 system.  You may modify several panels simultaneously or select a single panel to modify. 

 

 

G5 Role:  Program Office Staff (as long as their office is associated with the CFDA Subprogram) 

 

 

Navigation Path:  Grant Setup > Review Process > Panel Structure 

 

 

Prerequisites:  The prerequisites for this topic are: 

 

1. Approved reviewers have been entered into G5 and checked in EPLS. 

2. User has knowledge of the application Technical Review Plan and competition requirements. 

3. The grant schedule, associated with the competition, contains an activity for panel review with assigned start and end dates, allowing G5 to automatically populate these dates to the Panel Start and End Dates.  However, if the grant schedule does not have panel review dates, G5 will prompt the user to enter these dates. 

4. A competition panel exists in G5.


Table of Contents  Back

Modify a Panel Concept Pane