Purpose:  This procedure demonstrates how to manually assign reviewers to panels.  The manual process gives the user more control over who is assigned to each panel. 

 

 

G5 Role:  Program Office Staff (as long as their office is associated with the CFDA Subprogram) 

 

 

Navigation Path:  Grant Setup > Review Process > Establish Panel Structure 

 

 

Prerequisites:  The prerequisites for this topic are: 

 

1. Approved reviewers have been entered into G5 and checked in EPLS. 

2. User has knowledge of the application Technical Review Plan and competition requirements. 

3. The grant schedule, associated with the competition, contains an activity for panel review with assigned start and end dates, allowing G5 to automatically populate these dates to the Panel Start and End Dates.  However, if the grant schedule does not have panel review dates, G5 will prompt the user to enter these dates. 

4. A competition panel exists in G5.


Table of Contents  Back

Assign Reviewers Manually Concept Pane