Purpose: This procedure demonstrates how to assign a Quality Control Monitor (QCM) to a competition.
G5 Role: G5 Competition Manager
Navigation Path: Grant Setup> Review Process> Panel Structure
Prerequisites: The prerequisites for this topic are:
1. User has knowledge of the application Technical Review Plan and competition requirements.
2. An open competition panel exists in G5.
3. User has been assigned to a competition panel in G5 as a Quality Control Monitor (QCM).