Purpose:  This procedure demonstrates how to assign a Quality Control Monitor (QCM) to a competition. 

 

G5 Role:  G5 Competition Manager 

 

Navigation Path:  Grant Setup> Review Process> Panel Structure

 

Prerequisites:  The prerequisites for this topic are: 

 

1. User has knowledge of the application Technical Review Plan and competition requirements. 

2. An open competition panel exists in G5.

3. User has been assigned to a competition panel in G5 as a Quality Control Monitor (QCM). 


Table of Contents  Back

Assign QCM concept