Purpose: This procedure demonstrates how to modify a grant schedule in G5.  The grant schedule may be modified if it has a status of Active, Cancelled or Hold.  When the schedule is “unlocked,” any of the fields may be updated and activities may be added.  If the schedule is “locked,” then only the Revised Planned and actual dates may be updated.  Also, when the schedule is “locked” and it already has awards and/or applications associated with it, then it cannot be modified.

 


G5 Role: G5 Functional User

 

Navigation Path : Grant Setup > Planning and Scheduling > Grant Schedules

 

Prerequisites : The prerequisites for this topic are: 

1.  A grant schedule must exist in the G5 system. 

2.  The grant schedule cannot be in Awarded status when it is locked. 