Purpose : This procedure demonstrates how a grantee unsubmits a performance report.  In order for a grantee to unsubmit a report, the report must be in "Submitted" status.  The grantee may then edit or delete the report as needed.         


G5 Role : G5 Grantee 

 

Navigation Path : Grant Maintenance > Performance Reports > Package Submission 

 

Prerequisites : The prerequisites for this topic are: 

 

1. A performance report package has been created and published. 

2. A report has been completed and has the status of "Submitted." 


Table of Contents  Back

Unsubmit a Performance Report Concept Pane