Purpose : This procedure demonstrates how a grantee edits a performance report.  In order for a grantee to edit a report, the report must be in "Draft" or "Unsubmitted" status.         


G5 Role : G5 Grantee 

 

Navigation Path : Grant Maintenance > Performance Reports > Package Submission 

 

Prerequisites : The prerequisites for this topic are: 

 

1. A performance report package has been created and published. 

2. A report has been initiated or completed and has the status of "Draft" or "Unsubmitted." 


Table of Contents  Back

Edit a Performance Report Concept Pane